Your slab
Rectangular slab — measure the longest length and width.
4″ is standard for patios and walkways; 6″ for driveways and heavy loads.
Leave blank to hide the ready-mix cost. Typical ready-mix runs $125–$200 per cubic yard.
Your results
- Volume (cubic feet)
- Volume (cubic metres)
- 60-lb bags needed
- Cost — 60-lb bags
- 80-lb bags needed
- Cost — 80-lb bags
- Ready-mix cost
Enter your slab measurements and tap Calculate concrete to see the volume and bag count.
How it works
Concrete is sold by volume — bags by the cubic foot, ready-mix by the cubic yard — so everything starts with the slab's volume.
Cubic yards = cu ft ÷ 27 | Cubic metres = cu ft × 0.0283168
60-lb bags = round up (cu ft ÷ 0.45) | 80-lb bags = round up (cu ft ÷ 0.6)
- Measure the slab — length × width in feet (or metres), and pick the thickness: 4″ for patios, 6″ for driveways.
- Work out the volume — convert thickness to feet (divide inches by 12), then multiply. Divide by 27 for cubic yards, the unit ready-mix is sold in.
- Choose bags or ready-mix — under 1 cubic yard, bags are practical. Over that, a truck is usually cheaper and far less back-breaking.
- Add 5–10% extra — uneven ground and form bulging eat into the pour. A short load is the most expensive mistake in concrete work.
Frequently asked questions
Thickness, bags vs truck, curing — the essentials before you pour.
How thick should a concrete slab be?
4 inches is the standard thickness for patios, walkways and shed bases. Use 3 inches only for light foot traffic, and 6 inches for driveways or slabs that will carry vehicles or heavy loads.
Should I use bags or ready-mix concrete?
Bags suit small jobs under about 1 cubic yard — fence posts, small pads and repairs. Above 1 cubic yard (roughly 45 sixty-pound bags), ready-mix delivered by truck is usually cheaper, faster and gives a more consistent mix.
How long does concrete take to cure?
Concrete is walkable after about 24–48 hours, but it takes 28 days to reach full strength. Keep it damp for the first week and avoid driving on it for at least 7 days (longer in cold weather).
How much extra concrete should I order?
Order 5–10% extra to cover uneven subgrade, form bulging and spillage. Running short mid-pour is far worse than having a little left over — a cold joint weakens the slab.
How many 80 lb bags of concrete make a yard?
It takes 45 eighty-pound bags to make one cubic yard of concrete, or 60 sixty-pound bags. For anything over about 1 cubic yard, ready-mix delivered by truck is usually cheaper and far easier than mixing bags.
How thick should a concrete driveway be?
A residential driveway should be at least 4 inches thick for cars, and 5–6 inches if it will carry heavy trucks or RVs. Thicker slabs need more concrete — enter your thickness in the calculator to see the difference.